Skip to content

Africainvestor | Ai News | Ai TV | Ai Magazine | Ai Capital | Ai CEO Club

Pinterest page opens in new windowLinkedin page opens in new windowTwitter page opens in new windowFacebook page opens in new window
Ai PDF
The Ai African Project Developers Forum
Ai PDF
  • HOME
  • ABOUT THE FORUM
    • Background
    • Advisory board
    • Brochure
    • 2016 APDF CEO Consultation
  • DEVELOPERS SUMMIT
    • PROJECT DEVELOPERS AWARDS
  • REPORTS
    • I4PD Benchmark Report – 2018 Update – D16
    • Unlocking Actions to Mobilize Institutional Investment Focus Africa (2017)
    • Ai Benchmark Report Investing in African Infrastructure Project Development Report
    • NEPAD IIPPS Report 5 Agenda (Pdf version)
    • NEPAD IIPPS Report 5 agenda
    • Ai Top African Infrastructure Project Developers Report (2017)
    • Ai Top 100 Developers Report (2016)
    • Ai Top 100 Project Developers Report (2015)
    • Ai CEO Developers Summit Report Back 2015
    • Ai Magazine
    • Ai CEO Business Statement on the SDG’s
    • 2016 APDF CEO Consultation
  • DEVELOPERS TV
    • 2015 Project Developers TV
    • 2016 Project Developers TV
    • 2017 Project Developers TV
    • 2018 Project Developers TV
  • MEDIA
    • GALLERY
      • 2016 Project Developers Summit
      • 2017 Project Developers Summit
      • 2018 Project Developers Summit
    • PRESS
      • Press contacts
      • Press releases
  • CONTACT US
  • HOME
  • ABOUT THE FORUM
    • Background
    • Advisory board
    • Brochure
    • 2016 APDF CEO Consultation
  • DEVELOPERS SUMMIT
    • PROJECT DEVELOPERS AWARDS
  • REPORTS
    • I4PD Benchmark Report – 2018 Update – D16
    • Unlocking Actions to Mobilize Institutional Investment Focus Africa (2017)
    • Ai Benchmark Report Investing in African Infrastructure Project Development Report
    • NEPAD IIPPS Report 5 Agenda (Pdf version)
    • NEPAD IIPPS Report 5 agenda
    • Ai Top African Infrastructure Project Developers Report (2017)
    • Ai Top 100 Developers Report (2016)
    • Ai Top 100 Project Developers Report (2015)
    • Ai CEO Developers Summit Report Back 2015
    • Ai Magazine
    • Ai CEO Business Statement on the SDG’s
    • 2016 APDF CEO Consultation
  • DEVELOPERS TV
    • 2015 Project Developers TV
    • 2016 Project Developers TV
    • 2017 Project Developers TV
    • 2018 Project Developers TV
  • MEDIA
    • GALLERY
      • 2016 Project Developers Summit
      • 2017 Project Developers Summit
      • 2018 Project Developers Summit
    • PRESS
      • Press contacts
      • Press releases
  • CONTACT US

Egypt is set to construct El Dabaa nuclear power plant

You are here:
  1. Home
  2. Infrastructure
  3. Egypt is set to construct…
Oct122018
Infrastructure

GE Power has announced that it has won the contract to deliver the turbine island equipment for El Dabaa nuclear power plant project in Egypt through AAEM, its joint venture with Atomenergomash.

The solutions provider will supply the basic design of four conventional islands, supply four nuclear turbine generator sets, including the Arabelle half-speed steam turbines, as well as provide technical expertise for the on-site installation and commissioning.

“As Egypt works to diversify its energy production and to support its growing economy, the El Dabaa nuclear power plant, equipped with GE Power’s Arabelle technology, will help Egypt deliver on their ambitious goals,” said Andreas Lusch, CEO of GE’s Steam Power.

“Today, the Arabelle is helping to deliver more than 20GW of power around the world and we will leverage this experience and know-how to deliver reliable, dependable and CO2 free energy to the Egyptian grid,” Lusch added.

Electricity demand in Egypt has increased rapidly as a result of their growing population and increasing industrial activity.

It’s estimated that an additional 1.5GW of new capacity will be needed each year – that’s a 6% increase year over year until 2022.

To support this increasing demand without blackouts, Egypt has an ambitious energy plan which includes diversifying its installed base.

El Dabaa nuclear power plant

El Dabaa nuclear power plant will help deliver on that plan by stabilising the Egyptian grid with dependable, CO2 free energy and having a predictable low cost of electricity.

Once in operation, El Dabaa will produce 4.8GW – enough to power up more than 4 million homes across the North African country.

The El Dabaa project builds on GE Power supporting the development of Egypt’s energy sector for more than 40 years which includes delivering up to 16GW to the Egyptian grid.

Recently, the company completed building and connecting the Badr substation in the country to the national grid.

The new 500/220kV Gas-Insulated Substation will dispatch 1.5GW of electricity and play a strategic role in the upcoming Egypt – Saudi Arabia Interconnection, linking the national grids of both countries with a 1,300-km transmission line.

Category: InfrastructureOctober 12, 2018
Share this post
Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn

Related posts

Ethiopia Unveils Ten-Year Power Project Plan
September 20, 2021
Abu Dhabi Wealth Fund Targets Africa, Renewables to Lift Returns
December 8, 2020
Abu Dhabi Wealth Fund Targets Africa, Renewables to Lift Returns
December 8, 2020
Annual Pensions & Retirement Summit 2020 – Speaker: Hubert Danso: Chairman/CEO Africa Investor
November 13, 2020
Annual Pensions & Retirement Summit 2020 – Speaker: Hubert Danso: Chairman/CEO Africa Investor
November 13, 2020
Saudi public investment fund poised to invest in Egypt’s sovereign wealth fund
November 10, 2020

Egypt is set to construct El Dabaa nuclear power plant

You are here:
  1. Home
  2. Infrastructure
  3. Egypt is set to construct…
Oct122018
Infrastructure

GE Power has announced that it has won the contract to deliver the turbine island equipment for El Dabaa nuclear power plant project in Egypt through AAEM, its joint venture with Atomenergomash.

The solutions provider will supply the basic design of four conventional islands, supply four nuclear turbine generator sets, including the Arabelle half-speed steam turbines, as well as provide technical expertise for the on-site installation and commissioning.

“As Egypt works to diversify its energy production and to support its growing economy, the El Dabaa nuclear power plant, equipped with GE Power’s Arabelle technology, will help Egypt deliver on their ambitious goals,” said Andreas Lusch, CEO of GE’s Steam Power.

“Today, the Arabelle is helping to deliver more than 20GW of power around the world and we will leverage this experience and know-how to deliver reliable, dependable and CO2 free energy to the Egyptian grid,” Lusch added.

Electricity demand in Egypt has increased rapidly as a result of their growing population and increasing industrial activity.

It’s estimated that an additional 1.5GW of new capacity will be needed each year – that’s a 6% increase year over year until 2022.

To support this increasing demand without blackouts, Egypt has an ambitious energy plan which includes diversifying its installed base.

El Dabaa nuclear power plant

El Dabaa nuclear power plant will help deliver on that plan by stabilising the Egyptian grid with dependable, CO2 free energy and having a predictable low cost of electricity.

Once in operation, El Dabaa will produce 4.8GW – enough to power up more than 4 million homes across the North African country.

The El Dabaa project builds on GE Power supporting the development of Egypt’s energy sector for more than 40 years which includes delivering up to 16GW to the Egyptian grid.

Recently, the company completed building and connecting the Badr substation in the country to the national grid.

The new 500/220kV Gas-Insulated Substation will dispatch 1.5GW of electricity and play a strategic role in the upcoming Egypt – Saudi Arabia Interconnection, linking the national grids of both countries with a 1,300-km transmission line.

Category: InfrastructureOctober 12, 2018
Share this post
Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn

Related posts

Ethiopia Unveils Ten-Year Power Project Plan
September 20, 2021
Abu Dhabi Wealth Fund Targets Africa, Renewables to Lift Returns
December 8, 2020
Abu Dhabi Wealth Fund Targets Africa, Renewables to Lift Returns
December 8, 2020
Annual Pensions & Retirement Summit 2020 – Speaker: Hubert Danso: Chairman/CEO Africa Investor
November 13, 2020
Annual Pensions & Retirement Summit 2020 – Speaker: Hubert Danso: Chairman/CEO Africa Investor
November 13, 2020
Saudi public investment fund poised to invest in Egypt’s sovereign wealth fund
November 10, 2020
Copyright Africa investor Project Developers Forum

Powered by Netspace

Go to Top