Skip to content

Africainvestor | Ai News | Ai TV | Ai Magazine | Ai Capital | Ai CEO Club

Pinterest page opens in new windowLinkedin page opens in new windowTwitter page opens in new windowFacebook page opens in new window
Ai PDF
The Ai African Project Developers Forum
Ai PDF
  • HOME
  • ABOUT THE FORUM
    • Background
    • Advisory board
    • Brochure
    • 2016 APDF CEO Consultation
  • DEVELOPERS SUMMIT
    • PROJECT DEVELOPERS AWARDS
  • REPORTS
    • I4PD Benchmark Report – 2018 Update – D16
    • Unlocking Actions to Mobilize Institutional Investment Focus Africa (2017)
    • Ai Benchmark Report Investing in African Infrastructure Project Development Report
    • NEPAD IIPPS Report 5 Agenda (Pdf version)
    • NEPAD IIPPS Report 5 agenda
    • Ai Top African Infrastructure Project Developers Report (2017)
    • Ai Top 100 Developers Report (2016)
    • Ai Top 100 Project Developers Report (2015)
    • Ai CEO Developers Summit Report Back 2015
    • Ai Magazine
    • Ai CEO Business Statement on the SDG’s
    • 2016 APDF CEO Consultation
  • DEVELOPERS TV
    • 2015 Project Developers TV
    • 2016 Project Developers TV
    • 2017 Project Developers TV
    • 2018 Project Developers TV
  • MEDIA
    • GALLERY
      • 2016 Project Developers Summit
      • 2017 Project Developers Summit
      • 2018 Project Developers Summit
    • PRESS
      • Press contacts
      • Press releases
  • CONTACT US
  • HOME
  • ABOUT THE FORUM
    • Background
    • Advisory board
    • Brochure
    • 2016 APDF CEO Consultation
  • DEVELOPERS SUMMIT
    • PROJECT DEVELOPERS AWARDS
  • REPORTS
    • I4PD Benchmark Report – 2018 Update – D16
    • Unlocking Actions to Mobilize Institutional Investment Focus Africa (2017)
    • Ai Benchmark Report Investing in African Infrastructure Project Development Report
    • NEPAD IIPPS Report 5 Agenda (Pdf version)
    • NEPAD IIPPS Report 5 agenda
    • Ai Top African Infrastructure Project Developers Report (2017)
    • Ai Top 100 Developers Report (2016)
    • Ai Top 100 Project Developers Report (2015)
    • Ai CEO Developers Summit Report Back 2015
    • Ai Magazine
    • Ai CEO Business Statement on the SDG’s
    • 2016 APDF CEO Consultation
  • DEVELOPERS TV
    • 2015 Project Developers TV
    • 2016 Project Developers TV
    • 2017 Project Developers TV
    • 2018 Project Developers TV
  • MEDIA
    • GALLERY
      • 2016 Project Developers Summit
      • 2017 Project Developers Summit
      • 2018 Project Developers Summit
    • PRESS
      • Press contacts
      • Press releases
  • CONTACT US

Tanzania begins construction of US $1.38bn Rufijii hydropower plant

You are here:
  1. Home
  2. Infrastructure
  3. Tanzania begins construction of US…
Jul292019
InfrastructureMining & EnergyNews

Tanzania marked the beginning of construction of Rufiji power plant Rufiji Hydropower Project (RHPP) at Stiegler’s Gorge with President John Magufuli laying the foundation stone.

The government officially handed over the area around the 2,115-MW Rufiji hydro project to joint venture contractors Arab Contractors Company and Elsewedy Electric Company. Arab Contractors received a contract to design and construct the dam and power plant in October 2018.

“Today we save the people of Tanzania from shortage of power. Our envisaged industrial economy needs adequate, cheap and reliable power supply through hydrogeneration. This project has stalled for many years. We will build it with our own money,” said President Magufuli.

Rufiji power plant

Construction of the facility will involve building a main dam and appurtenant structures, with expected reservoir length of 100 km, covering an area of about 1,350 square km. The dam height is about 134 meters. The dam will be fourth largest in Africa and ninth in the world.

The power plant which is being built for the Tanzania Electric Supply Company Limited (Tanesco), upon completion will will more than triple the country’s current installed hydropower capacity of 562 MW. The project will cost an estimated US $1.38b and is set to be completed in 2022.

Shadow minister for energy John Mnyika however said the project is costly and will have an adverse economic impact. He said in parliament that construction of the power plant could take nine to 12 years, contrary to the government’s insistence that it is a three-year project. He pointed out that costs are likely to jump from US $1.38 bn to US $9.8bn as a result of cost overruns.

Categories: Infrastructure, Mining & Energy, NewsJuly 29, 2019
Share this post
Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn

Related posts

G7 Africa Heads of State Summit Advances Sovereign Infrastructure as Global Asset Class for the AI-Industrial Era
May 12, 2026
Private Capital Mobilisation – why we need to speak up, not just pay up
July 11, 2024
Funding Vital Emerging & Developing Market Projects: How GEMS and Private Markets can Help Achieve Scale
June 12, 2024
Dr. Danso’s Investor Letter on Allocating to African Green Industrial Infrastructure as a Globally Competitive Investable Asset Class
April 20, 2024
A Private Sector Ministers of Finance Call to Action
March 11, 2024
AU Summit Africa Business Forum addresses ‘Making Development Investable’
February 21, 2024

Tanzania begins construction of US $1.38bn Rufijii hydropower plant

You are here:
  1. Home
  2. Infrastructure
  3. Tanzania begins construction of US…
Jul292019
InfrastructureMining & EnergyNews

Tanzania marked the beginning of construction of Rufiji power plant Rufiji Hydropower Project (RHPP) at Stiegler’s Gorge with President John Magufuli laying the foundation stone.

The government officially handed over the area around the 2,115-MW Rufiji hydro project to joint venture contractors Arab Contractors Company and Elsewedy Electric Company. Arab Contractors received a contract to design and construct the dam and power plant in October 2018.

“Today we save the people of Tanzania from shortage of power. Our envisaged industrial economy needs adequate, cheap and reliable power supply through hydrogeneration. This project has stalled for many years. We will build it with our own money,” said President Magufuli.

Rufiji power plant

Construction of the facility will involve building a main dam and appurtenant structures, with expected reservoir length of 100 km, covering an area of about 1,350 square km. The dam height is about 134 meters. The dam will be fourth largest in Africa and ninth in the world.

The power plant which is being built for the Tanzania Electric Supply Company Limited (Tanesco), upon completion will will more than triple the country’s current installed hydropower capacity of 562 MW. The project will cost an estimated US $1.38b and is set to be completed in 2022.

Shadow minister for energy John Mnyika however said the project is costly and will have an adverse economic impact. He said in parliament that construction of the power plant could take nine to 12 years, contrary to the government’s insistence that it is a three-year project. He pointed out that costs are likely to jump from US $1.38 bn to US $9.8bn as a result of cost overruns.

Categories: Infrastructure, Mining & Energy, NewsJuly 29, 2019
Share this post
Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn

Related posts

G7 Africa Heads of State Summit Advances Sovereign Infrastructure as Global Asset Class for the AI-Industrial Era
May 12, 2026
Private Capital Mobilisation – why we need to speak up, not just pay up
July 11, 2024
Funding Vital Emerging & Developing Market Projects: How GEMS and Private Markets can Help Achieve Scale
June 12, 2024
Dr. Danso’s Investor Letter on Allocating to African Green Industrial Infrastructure as a Globally Competitive Investable Asset Class
April 20, 2024
A Private Sector Ministers of Finance Call to Action
March 11, 2024
AU Summit Africa Business Forum addresses ‘Making Development Investable’
February 21, 2024
Copyright Africa investor Project Developers Forum

Powered by Netspace

Go to Top