Skip to content

Africainvestor | Ai News | Ai TV | Ai Magazine | Ai Capital | Ai CEO Club

Pinterest page opens in new windowLinkedin page opens in new windowTwitter page opens in new windowFacebook page opens in new window
Ai PDF
The Ai African Project Developers Forum
Ai PDF
  • HOME
  • ABOUT THE FORUM
    • Background
    • Advisory board
    • Brochure
    • 2016 APDF CEO Consultation
  • DEVELOPERS SUMMIT
    • PROJECT DEVELOPERS AWARDS
  • REPORTS
    • I4PD Benchmark Report – 2018 Update – D16
    • Unlocking Actions to Mobilize Institutional Investment Focus Africa (2017)
    • Ai Benchmark Report Investing in African Infrastructure Project Development Report
    • NEPAD IIPPS Report 5 Agenda (Pdf version)
    • NEPAD IIPPS Report 5 agenda
    • Ai Top African Infrastructure Project Developers Report (2017)
    • Ai Top 100 Developers Report (2016)
    • Ai Top 100 Project Developers Report (2015)
    • Ai CEO Developers Summit Report Back 2015
    • Ai Magazine
    • Ai CEO Business Statement on the SDG’s
    • 2016 APDF CEO Consultation
  • DEVELOPERS TV
    • 2015 Project Developers TV
    • 2016 Project Developers TV
    • 2017 Project Developers TV
    • 2018 Project Developers TV
  • MEDIA
    • GALLERY
      • 2016 Project Developers Summit
      • 2017 Project Developers Summit
      • 2018 Project Developers Summit
    • PRESS
      • Press contacts
      • Press releases
  • CONTACT US
  • HOME
  • ABOUT THE FORUM
    • Background
    • Advisory board
    • Brochure
    • 2016 APDF CEO Consultation
  • DEVELOPERS SUMMIT
    • PROJECT DEVELOPERS AWARDS
  • REPORTS
    • I4PD Benchmark Report – 2018 Update – D16
    • Unlocking Actions to Mobilize Institutional Investment Focus Africa (2017)
    • Ai Benchmark Report Investing in African Infrastructure Project Development Report
    • NEPAD IIPPS Report 5 Agenda (Pdf version)
    • NEPAD IIPPS Report 5 agenda
    • Ai Top African Infrastructure Project Developers Report (2017)
    • Ai Top 100 Developers Report (2016)
    • Ai Top 100 Project Developers Report (2015)
    • Ai CEO Developers Summit Report Back 2015
    • Ai Magazine
    • Ai CEO Business Statement on the SDG’s
    • 2016 APDF CEO Consultation
  • DEVELOPERS TV
    • 2015 Project Developers TV
    • 2016 Project Developers TV
    • 2017 Project Developers TV
    • 2018 Project Developers TV
  • MEDIA
    • GALLERY
      • 2016 Project Developers Summit
      • 2017 Project Developers Summit
      • 2018 Project Developers Summit
    • PRESS
      • Press contacts
      • Press releases
  • CONTACT US

The new Nile bridge in Uganda commissioned

You are here:
  1. Home
  2. Uncategorized
  3. The new Nile bridge in…
Oct192018
Uncategorized

Uganda’s President, Yoweri Kaguta Museveni has commissioned the US $129m new Nile bridge in Jinja Uganda.

“I’m happy the work is done. We did best quality assurance and rigorous quality control and tested the construction materials with state-of-the-art equipment, both within and abroad in Singapore and Japan. The bridge is an excellent piece of engineering,” said Eng Lawrence Pario, the contractor manager responsible for overall coordination, supervision and management of the project.

Also Read:The New Nile cable stayed bridge

The new Nile bridge

The new Nile bridge which was financed by the Japanese government, is a cable stayed bridge which will align at 500 metres upstream of Nalubaale Dam with river width of 300 metres. The 525 metre-long bridge has a central span of 290 metres, end spans of 135 metres and 100 metres on the east and west banks respectively.

The Nile bridge, also is the first cable-stayed bridge in East Africa crossing the Victoria Nile, will link the Northern Corridor that connects Kenya with the Democratic Republic of Congo.

The bridge was designed with a structural life span of 120 years.The Japanese loan agreement for the Nile Bridge construction will be paid back at 0.01 % of annual interest rate within 40 years. Under the concession, Uganda was given a grace period of 10 years.

Fifth longest cable-stayed bridge

Source of Nile Bridge has also been ranked as the fifth longest cable-stayed bridge behind Egypt’s Suez Canal Bridge (3,900), Lekki Ikoyi Bridge in Nigeria (1,360m), Mohammed VI Bridge in Morocco (950m) and Tanzania’s Kigamboni.

Samuel Muhoozi, the Director of Roads and Bridges at Uganda National Roads Authority (UNRA), contends that the new bridge has the ability to become a major tourist attraction because of its novelty.

“One of the aims of constructing this bridge was enhancing tourism with addition of this iconic signature bridge in this picturesque location,” said Samuel Muhoozi.

The name
Zenitaka Corporation and Hyundai Engineering and Construction Company from Japan and South Korea, respectively, erected the overpass formally named The Source of Nile Bridge for its proximity to the upstream point where River Nile flows out of Lake Victoria.
It is planned to be adorned with Uganda, Japan and Uganda National Roads Authority (Unra) flags to symbolize the partnership between the trio.

The signature beauty of the gigantic concrete and steel structure is 72 harp-like white cables connecting the bridge deck to two 69-metre tall inverted-Y pylon towers.

Category: UncategorizedOctober 19, 2018
Share this post
Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn

Related posts

Institutional investment community urged to speak up to help improve private capital mobilization
July 17, 2024
Africa investor (Ai) Rallies Institutional Investors during IDA Africa Presidential Summit
May 2, 2024
African institutional investors call for partnerships to build resilient economies
May 19, 2020
African institutional investors call for partnerships to build resilient economies
May 19, 2020
ICC joins global trade organisation heads for summit on impact of COVID-19 on Africa
May 6, 2020
Africa investor (Ai) Convenes Heads of Global Trade Organisations Summit on the African Continental Free Trade Area (AfCFTA)
May 1, 2020

The new Nile bridge in Uganda commissioned

You are here:
  1. Home
  2. Uncategorized
  3. The new Nile bridge in…
Oct192018
Uncategorized

Uganda’s President, Yoweri Kaguta Museveni has commissioned the US $129m new Nile bridge in Jinja Uganda.

“I’m happy the work is done. We did best quality assurance and rigorous quality control and tested the construction materials with state-of-the-art equipment, both within and abroad in Singapore and Japan. The bridge is an excellent piece of engineering,” said Eng Lawrence Pario, the contractor manager responsible for overall coordination, supervision and management of the project.

Also Read:The New Nile cable stayed bridge

The new Nile bridge

The new Nile bridge which was financed by the Japanese government, is a cable stayed bridge which will align at 500 metres upstream of Nalubaale Dam with river width of 300 metres. The 525 metre-long bridge has a central span of 290 metres, end spans of 135 metres and 100 metres on the east and west banks respectively.

The Nile bridge, also is the first cable-stayed bridge in East Africa crossing the Victoria Nile, will link the Northern Corridor that connects Kenya with the Democratic Republic of Congo.

The bridge was designed with a structural life span of 120 years.The Japanese loan agreement for the Nile Bridge construction will be paid back at 0.01 % of annual interest rate within 40 years. Under the concession, Uganda was given a grace period of 10 years.

Fifth longest cable-stayed bridge

Source of Nile Bridge has also been ranked as the fifth longest cable-stayed bridge behind Egypt’s Suez Canal Bridge (3,900), Lekki Ikoyi Bridge in Nigeria (1,360m), Mohammed VI Bridge in Morocco (950m) and Tanzania’s Kigamboni.

Samuel Muhoozi, the Director of Roads and Bridges at Uganda National Roads Authority (UNRA), contends that the new bridge has the ability to become a major tourist attraction because of its novelty.

“One of the aims of constructing this bridge was enhancing tourism with addition of this iconic signature bridge in this picturesque location,” said Samuel Muhoozi.

The name
Zenitaka Corporation and Hyundai Engineering and Construction Company from Japan and South Korea, respectively, erected the overpass formally named The Source of Nile Bridge for its proximity to the upstream point where River Nile flows out of Lake Victoria.
It is planned to be adorned with Uganda, Japan and Uganda National Roads Authority (Unra) flags to symbolize the partnership between the trio.

The signature beauty of the gigantic concrete and steel structure is 72 harp-like white cables connecting the bridge deck to two 69-metre tall inverted-Y pylon towers.

Category: UncategorizedOctober 19, 2018
Share this post
Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn

Related posts

Institutional investment community urged to speak up to help improve private capital mobilization
July 17, 2024
Africa investor (Ai) Rallies Institutional Investors during IDA Africa Presidential Summit
May 2, 2024
African institutional investors call for partnerships to build resilient economies
May 19, 2020
African institutional investors call for partnerships to build resilient economies
May 19, 2020
ICC joins global trade organisation heads for summit on impact of COVID-19 on Africa
May 6, 2020
Africa investor (Ai) Convenes Heads of Global Trade Organisations Summit on the African Continental Free Trade Area (AfCFTA)
May 1, 2020
Copyright Africa investor Project Developers Forum

Powered by Netspace

Go to Top